Texas Instruments TPS536C7EVM-051 Evaluation Module

Texas Instruments TPS536C7EVM-051 Evaluation Module is configured to evaluate the operation of the TPS536C7 Controller. The TPS536C7 Controller is a dual-channel (12+0, 11+1, or 10+2 phases), D-CAP+ synchronous buck driverless control with PMBus Interface.

The TI TPS536C7EVM-051 Evaluation Module uses the CSD95490 Synchronous Buck NexFET™ Smart Power Stage device as the power stage and includes test points for evaluating the performance of the TPS536C7 controller and CSD95410 power stages.

Features

  • Dual-regulated high current outputs
  • Configurable as maximum phases 12+0, 11+1 and 10+2
  • Programmable settings are available through the PMBus™ interface
  • Output voltage trim
  • Output voltage margin levels (High / Low) within a maximum range
  • UVLO protection threshold
  • Soft-start slew-rate
  • Device enable and disable
  • Overcurrent warning and fault limits
  • Switching frequency
  • BOOT voltage
  • Monitoring of input and output voltage, current, power, and power stage temperature
  • Convenient test points for probing critical waveforms

Applications

  • High current ASIC and FPGA core power in the following equipment
    • Wired and wireless networking
    • Enterprise server and storage networks
    • Test and measurement
    • Smart grid infrastructure
    • Aerospace and defense
    • Merchant power supplies

Test Setup

Texas Instruments TPS536C7EVM-051 Evaluation Module

Board Layout

Texas Instruments TPS536C7EVM-051 Evaluation Module
Đã phát hành: 2020-10-29 | Đã cập nhật: 2024-09-12