Texas Instruments DIGI-ISO-EVM Digital Isolator Evaluation Module

Texas Instruments DIGI-ISO-EVM Digital Isolator Evaluation Module (EVM) is used to evaluate any of the TI single-channel, dual-channel, triple-channel, quad-channel, or six-channel digital isolator devices. It works in five different packages - 8-pin NB SOIC (D), 8-pin WB SOIC (DWV), 16-pin WB SOIC (DW), 16-pin ultra WB SOIC (DWW), and 16-pin QSOP (DBQ) packages. The evaluation module features enough Berg pin options for one to evaluate the device with minimal external components.

Features

  • Designed so that any TI digital isolator can be evaluated
  • Supports single-channel, dual-channel, triple-channel, quad-channel, and six-channel devices
  • Supports D, DWV, DW, DWW, and DBQ packages
  • Various Berg pins provided for easy testing

Test Setup

Chart - Texas Instruments DIGI-ISO-EVM Digital Isolator Evaluation Module
Đã phát hành: 2021-03-25 | Đã cập nhật: 2025-04-10