Texas Instruments TMAG5170UEVM 3D Hall-Effect Sensor EVM
Texas Instruments TMAG5170UEVM 3D Hall-Effect Sensor Evaluation Module (EVM) is an easy-to-use platform for evaluating the main features and performance of the TMAG5170. The Texas Instruments TMAG5170UEVM includes a graphical user interface (GUI) used to read and write registers and view and save measurement results. Also included is a 3D printed rotate and push module to test the common functions of angle measurement and push-button with a single device.Features
- Snap apart PCB for evaluation of both TMAG5170A1 and TMAG5170A2 sensitivities
- GUI support to read and write device registers as well as view and save measurement results
- 3D print rotate and push module
- Detachable evaluation module for custom-use cases
- Conveniently powered from a common micro-USB connector
Kit Contents
- TMAG5170UEVM evaluation module
- Rotate and push 3D print module
- Handheld magnet
- USB cable
- SENS077A (TI-SCB)
Board Layout
Đã phát hành: 2021-10-08
| Đã cập nhật: 2025-03-26
